Process — Phase 02 Est. 2010

Design
Development

Collaborative plans, materials, and systems — refined until every detail aligns with the vision, the budget, and the site.

01Architectural Plans02Materials Library03Engineering & Permits04Fixed Budget Sign-Off
8–16Weeks
FixedBudget Sign-Off
0Surprises
01 — Phase 02 · 8–16 weeks

Refined until
every detail aligns.

Design development is collaborative — plans, materials, and systems worked through with you, detail by detail, until the drawings match the vision, the budget, and the site. The phase closes with a fixed budget sign-off: itemized, transparent, no surprises.

Custom kitchen millwork and finishes at 215 80th Ave 01
01215 80th AveMaterials
Marble walk-in shower at 849 Bluffview 02
02849 BluffviewFinishes
Custom iron staircase at 1025 Muscovy 03
031025 MuscovyCraft
02 — The Steps Phase 02 of 03
02.1

Architectural Plans

Collaborative drawings refined with you, round by round, until every detail aligns with the vision, the budget, and the site the program defined.

Collaborative
02.2

Materials Library

Only the finest materials, specified by us and reviewed with you — natural materials, custom millwork, and the finishes that give the home its character.

Finest materials
02.3

Engineering & Permits

Structural engineering and permitting handled by the studio, coordinated with the same long-standing trade partners who will build the home.

Handled for you
02.4

Fixed Budget Sign-Off

The phase closes on a fixed budget — itemized and transparent, with change orders itemized from here forward. No surprises is a value, not a slogan.

Itemized
Custom built-in cabinetry at 2500 Old Tram
03 — The Outcome

You leave with
a buildable design.

By the end of Phase 02 the plans are complete, permits are in motion, and the budget is fixed and signed — everything the build phase needs to run on schedule integrity.