Process — Phase 03 Est. 2010

Build
& Handover

Meticulous scheduling, on-site quality control, and a closing walk designed to exceed day-one expectations — not meet them.

01Weekly Client Updates02On-Site QA Reviews03Final Punch & Walk042-Year Warranty
6–12Months
WeeklyUpdates
2-YrWarranty
01 — Phase 03 · 6–12 months

Built on site,
run like a studio.

Weekly on-site check-ins, a single point of contact, and a project dashboard with photos, progress, and upcoming decisions. The final walk happens only when the punch list is at zero — and a two-year warranty follows you home.

Detached garage with custom carriage doors at 3751 Highway 319 01
013751 Highway 319The Build
Finished living room with coffered ceiling at 215 80th Ave 02
02215 80th AveThe Finish
Front entry with leaded glass door at 1025 Muscovy 03
031025 MuscovyThe Handover
02 — The Steps Phase 03 of 03
03.1

Weekly Client Updates

Weekly on-site check-ins with a single point of contact, plus a dedicated project dashboard with photos, progress, and the decisions coming up next.

Every week
03.2

On-Site QA Reviews

On-site quality control throughout the build — every detail specified by us and executed by our long-standing trade partners, to the same standard on every project.

Owner-led
03.3

Final Punch & Walk

The closing walk is designed to exceed day-one expectations, not meet them — and it only happens when the punch list is at zero.

Punch at zero
03.4

2-Year Warranty

Handover isn't the end of the relationship. Every Richardson project carries a two-year warranty, backed by the studio that built it.

2 years
Covered outdoor patio at 3751 Highway 319
03 — The Outcome

You leave with
the keys.

A finished home, a punch list at zero, a two-year warranty — and a builder you can still call. That's what handover means at Richardson.

Start a Project Full Process